Moma Titanium Mine’s $341M Upgrade Unlocks Nataka Deposit

Moma titanium mine upgrade project rendering.

Project Overview and Strategic Significance

The Moma titanium mine upgrade represents a transformative $341 million modernisation initiative that unlocks access to one of Africa's most substantial mineral deposits. Located along Mozambique's northeast coast, this comprehensive upgrade of Wet Concentrator Plant A (WCP A) enables mining operations to transition from the depleted Namalope zone to the massive Nataka ore deposit, which contains 6.4 billion tonnes of the mine's total 9 billion tonnes of mineral resources.

This strategic transition represents more than a simple equipment upgrade. Furthermore, the project secures decades of future titanium production by accessing over 70% of Moma's total mineral wealth, positioning the operation as a cornerstone of global titanium supply well beyond the current mine plan horizon of 2045. The timing proves critical as global demand for titanium dioxide pigments, aerospace applications, and specialty alloys continues expanding across multiple industries.

Nataka's Strategic Resource Foundation

The Nataka transition addresses a fundamental challenge facing many mature mining operations: maintaining production levels while accessing increasingly challenging ore bodies. Unlike many mine expansions that require exploring unproven deposits, this project taps into extensively characterised resources that have awaited technological solutions to overcome their processing challenges.

In addition, the deposit's scale becomes apparent when considering that this single transition secures the mine's operational future for multiple decades. Industry analysis suggests that few mining operations globally can point to such substantial proven reserves accessible through a single major infrastructure investment, making this upgrade particularly significant within the broader titanium mining landscape.

Advanced Processing Technology Integration

The WCP A upgrade incorporates specialised equipment designed specifically for Nataka's challenging ore characteristics, which contain significantly higher levels of fine, clay-like particles known as slimes compared to the previously mined Namalope deposit. However, these slimes require sophisticated separation techniques to maintain efficient mineral recovery rates whilst preventing operational complications that could compromise plant performance.

Two new high-capacity dredges replace existing equipment, integrating seamlessly with an enhanced feed preparation unit featuring upfront desliming circuits. This configuration addresses the fundamental challenge posed by Nataka's ore composition: separating valuable titanium minerals and zircon from interfering clay particles before primary processing begins.

Enhanced Processing Capabilities:

• Capacity Increase: Processing throughput reaches 3,500 tonnes per hour, representing substantial improvement over previous operational parameters

• Specialised Dredging: Two high-capacity dredges specifically engineered for challenging ore conditions

• Advanced Separation: Upfront desliming circuits optimise mineral recovery from high-slimes content ore

• Integrated Systems: New equipment seamlessly connects with existing WCP A infrastructure

The desliming technology represents a significant advancement in heavy mineral processing, addressing challenges that have historically limited access to slimes-rich deposits. Consequently, this innovation could influence processing approaches at similar operations worldwide, potentially unlocking previously uneconomic mineral resources.

Feed Preparation System Innovations

The upgraded feed preparation unit incorporates advanced screening and separation technologies that optimise mineral recovery before primary processing begins. For instance, this front-end optimisation proves particularly crucial when processing Nataka's ore, as effective slimes removal at the earliest stage prevents downstream complications that could reduce overall plant efficiency.

The system's design reflects lessons learned from 17 years of operations in the Namalope zone, incorporating process improvements that enhance both operational reliability and environmental performance. Moreover, water recycling systems minimise environmental impact whilst maintaining the high-volume processing requirements necessary for economic operation.

Geological Characteristics and Processing Innovation

Nataka's ore body presents unique challenges that distinguish it from typical heavy mineral sand deposits. The elevated slimes content requires specialised handling techniques that go beyond conventional heavy mineral processing approaches, necessitating the innovative desliming circuits that form a central component of the upgrade project.

Furthermore, the deposit's geological characteristics reflect its formation history, with fine clay particles intermixed with valuable heavy minerals in concentrations that demand careful separation to maintain economic recovery rates. Understanding these characteristics proved essential for modern mine planning systems capable of handling the ore efficiently over multiple decades of operation.

Key Geological Features:

Characteristic Namalope (Previous) Nataka (New)
Resource Volume Limited reserves 6.4 billion tonnes
Slimes Content Lower levels Significantly higher
Processing Complexity Standard separation Advanced desliming required
Mining Duration 17 years completed Decades ahead

Ore Body Scale and Composition

The Nataka deposit contains substantial reserves of ilmenite, rutile, and zircon distributed throughout 6.4 billion tonnes of mineral-bearing sands. This scale ensures long-term operational viability extending well beyond current mine planning horizons, providing security for both the operation and its stakeholders.

Industry experts note that few titanium operations globally can point to such extensive proven reserves accessible through existing infrastructure. Consequently, this resource security becomes increasingly valuable as exploration costs rise and new deposit discoveries become more challenging to develop economically.

Implementation Timeline and Operational Transition

Commissioning activities commenced on October 2, 2025, marking the beginning of a carefully orchestrated production ramp-up process. The upgraded plant is expected to achieve full operational capacity of 3,500 tonnes per hour by the end of 2025, with progressive optimisation of new equipment and process modifications continuing through the fourth quarter.

Ben Baxter, Chief Operating Officer at Kenmare Resources, confirmed on October 8, 2025, that the two new dredges and feed preparation unit had been successfully connected to WCP A, with commissioning and production processes expected to ramp up through the fourth quarter as new equipment and process changes are progressively brought to design capacity.

Critical Timeline Milestones:

• October 2025: Commissioning activities begin with successful equipment integration

• Q4 2025: Full capacity achievement target of 3,500 tonnes per hour

• Q2 2026: Namalope mining operations completion after 17 years

• Late Q2 2026: Physical transition to Nataka mining zone initiation

• Q4 2027: Estimated completion of 18-month transition process

Transition Logistics and Challenges

The physical transition from Namalope to Nataka represents one of the most complex logistical undertakings in the operation's history. This 18-month process involves relocating floating processing equipment, establishing new mining ponds, and ensuring continuous production throughout the transition period.

WCP A will complete mining operations in the current Namalope zone during the second quarter of 2026, having extracted minerals from this deposit for 17 years. However, the transition to Nataka from late in the second quarter of 2026 requires careful coordination to maintain production continuity whilst physically moving massive processing equipment to the new mining zone.

Global Titanium Market Positioning

The Moma titanium mine upgrade project secures continued production from one of the world's most significant titanium mineral sources, maintaining supply stability for industries dependent on titanium dioxide pigments, aerospace applications, and specialty alloys. This supply security becomes increasingly critical as global titanium demand continues expanding across multiple industrial sectors.

Furthermore, the operation's strategic importance extends beyond simple production volumes. WCP A represents approximately 50% of Moma's total mining capacity, making this upgrade crucial for maintaining the mine's position within global supply chains that depend on consistent, high-quality titanium mineral feedstock.

Market Impact Considerations:

• Supply Security: Maintains production from proven, large-scale titanium source

• Quality Consistency: Established processing expertise applied to new ore body

• Long-term Reliability: Decades of proven reserves support market confidence

• Strategic Location: Mozambique's coastal position facilitates global distribution

Industrial Demand Drivers

Titanium dioxide pigment production represents the largest end-use market for titanium minerals, with applications spanning paints, coatings, plastics, and paper industries. In contrast, aerospace applications, whilst smaller in volume, require high-purity titanium materials that command premium pricing and represent growing market segments.

The upgrade positions Moma to serve both traditional pigment markets and emerging applications including advanced coatings, specialised alloys, and potentially new technologies requiring high-performance titanium materials. Consequently, this market diversification provides resilience against cyclical demand patterns in individual industrial sectors.

What Environmental and Infrastructure Improvements Are Included?

The project includes construction of a new tailings storage facility (TSF) designed to meet contemporary environmental standards whilst accommodating increased processing volumes from Nataka operations. This infrastructure investment reflects evolving best practices in mining waste management and positions the operation for long-term environmental compliance.

Moreover, advanced water recycling systems optimise water usage whilst reducing environmental impact, addressing both operational efficiency and sustainability objectives. The desliming circuits specifically address challenges posed by Nataka's ore characteristics whilst incorporating mine reclamation innovation measures throughout the process design.

Infrastructure Improvements:

• Modern Tailings Management: New TSF incorporates contemporary environmental standards

• Water Conservation: Advanced recycling systems reduce freshwater requirements

• Process Optimisation: Desliming circuits minimise waste whilst maximising recovery

• Operational Efficiency: Integrated systems reduce energy consumption per tonne processed

Sustainable Operations Framework

The upgrade incorporates sustainability considerations throughout the design process, from equipment selection to process optimisation. Water management proves particularly critical given the operation's location and the increased processing volumes anticipated from Nataka mining.

Furthermore, modern tailings storage design reflects industry best practices developed through decades of learning across the global mining sector. The new facility incorporates safety factors and monitoring systems that exceed minimum regulatory requirements, providing additional security for both operational and environmental performance.

Economic Implications for Mozambique

The successful transition to Nataka mining secures employment for local communities and maintains the mine's role as a significant economic driver in northeastern Mozambique for decades to come. This long-term security proves particularly valuable for regional economic planning and infrastructure development initiatives.

In addition, the Moma operation contributes substantially to Mozambique's mineral export revenue and foreign exchange earnings, making this upgrade crucial for maintaining the country's position within global commodity markets. The extended operational life secured through this investment provides economic stability that extends far beyond the immediate mining operation.

Economic Impact Areas:

• Employment Security: Long-term job protection for local communities

• Export Revenue: Continued contribution to national foreign exchange earnings

• Regional Development: Supporting infrastructure and service industries

• Government Revenue: Sustained tax and royalty payments over extended period

Community and Regional Benefits

The upgrade's success ensures continued economic activity throughout the region, supporting not only direct employment at the mine but also indirect employment in supporting industries and services. This economic multiplier effect proves particularly important in Mozambique's developing economy.

Moreover, local procurement opportunities associated with ongoing operations provide revenue streams for regional businesses, whilst infrastructure investments associated with the upgrade benefit broader community development objectives. The long-term nature of the Nataka resource base provides confidence for additional private sector investment in the region.

Comparative Plant Operations and Integration

WCP A represents approximately 50% of Moma's total mining capacity, making it the largest and most critical processing unit within the operation. The other two plants, WCP B and WCP C, continue operating in their current configurations whilst WCP A undergoes its transformation and transition process.

The three floating wet concentrator plants work in coordination, with four dredges feeding the three processing units through a carefully orchestrated system that maximises overall efficiency and production capability. However, WCP A's upgrade enhances the entire system's performance whilst maintaining operational flexibility across the integrated mining complex.

Integrated System Configuration:

Component Specification Integration Role
Processing Plants 3 floating WCPs (A, B, C) Coordinated production system
Dredging System 4 dredges total Feed distribution to three plants
WCP A Capacity 50% of total operation Dominant production unit
System Efficiency Optimised coordination Maximised overall throughput

Operational Coordination Strategies

The integrated mining system requires sophisticated coordination to optimise production across all three processing units whilst accounting for varying ore characteristics, equipment maintenance schedules, and market demand patterns. WCP A's upgrade enhances this coordination capability through improved processing efficiency and reliability.

System-wide optimisation becomes particularly important during WCP A's transition period, when the other two plants must maintain production continuity whilst the largest unit relocates to Nataka. This operational challenge demonstrates the importance of having multiple processing units that can adapt to changing operational requirements.

Financial Strategy and Investment Framework

Kenmare Resources plans to finance the $341 million upgrade through existing cash flow generation and established debt facilities, demonstrating confidence in both the project's economic viability and the company's financial stability. This financing approach avoids equity dilution whilst leveraging the operation's strong cash generation capability.

The investment represents substantial long-term value creation, securing access to 70% of Moma's mineral resources through a single major capital expenditure. Whilst specific financial returns remain confidential, the project's fundamental economics rest on proven reserves, established processing expertise, and secured market access, making it an attractive investment strategy for long-term stakeholders.

Investment Characteristics:

• Total Capital: $341 million for upgrade, transition, and infrastructure

• Funding Sources: Internal cash flow and existing debt facilities

• Resource Access: Unlocks 6.4 billion tonnes of proven reserves

• Operational Life: Secures production beyond 2045 mine plan horizon

Strategic Financial Planning

The financing strategy reflects careful balance between capital efficiency and operational security. By utilising existing cash flow and debt facilities, the project avoids external funding complications whilst maintaining financial flexibility for future opportunities or operational challenges.

Return on investment projections, whilst not publicly detailed, rest on decades of proven mineral reserves accessible through established infrastructure. Consequently, this combination of resource security and operational expertise provides confidence for both management and financial stakeholders supporting the investment.

How Does Technology Innovation Support Future Operations?

The new desliming circuits represent significant technological advancement, specifically engineered to separate valuable minerals from higher clay content whilst maintaining recovery efficiency. This innovation addresses processing challenges that have historically limited access to slimes-rich deposits across the heavy minerals industry.

Furthermore, AI in mining operations and advanced feed preparation systems incorporate cutting-edge screening and separation technologies designed to optimise mineral recovery from challenging ore compositions before primary processing begins. These innovations position Moma at the forefront of heavy mineral processing technology.

Technological Advancement Areas:

• Desliming Innovation: Specialised circuits for high-slimes ore processing

• Feed Preparation: Advanced screening and separation technology

• Process Integration: Seamless connection with existing infrastructure

• Future Adaptability: Technology foundation for potential expansions

Technology Transfer Potential

The innovations developed for Nataka's processing challenges could influence approaches at similar operations worldwide, potentially unlocking previously uneconomic mineral resources. This technology transfer potential extends the project's significance beyond Moma's immediate operational benefits.

Industry observers note that successful processing of high-slimes heavy mineral deposits represents a technological breakthrough that could revitalise mature operations facing similar challenges. The proven technology developed at Moma may find applications across multiple continents where similar ore bodies await economic processing solutions.

Long-term Operational Sustainability

The Nataka transition represents the only major relocation required during WCP A's economic life, which extends beyond 2045. This single transition secures multiple decades of continued production from proven reserves, providing exceptional operational stability within the volatile mining sector.

Moreover, the advanced processing systems installed during this upgrade provide a technological foundation that could accommodate future enhancements or capacity expansions as market conditions warrant. This forward-looking approach ensures the infrastructure investment remains relevant throughout the extended operational period, aligning with industry evolution trends towards sustainable mining practices.

Sustainability Framework:

• Extended Mine Life: Production security beyond 2045 planning horizon

• Single Transition: Only major relocation required in economic life

• Technology Foundation: Infrastructure supports future adaptations

• Resource Security: Access to 70% of total proven mineral reserves

Future Development Opportunities

The technological infrastructure installed during this upgrade creates opportunities for future operational enhancements without requiring fundamental system redesign. This adaptability proves particularly valuable given the extended operational timeline anticipated for Nataka mining.

Market evolution over the coming decades may create opportunities for specialised product development, capacity expansion, or process optimisation that build upon the current upgrade investment. Consequently, the robust technological foundation established through this project positions Moma to capitalise on such opportunities as they emerge.

What Are the Broader Industry Implications?

The successful commissioning of Kenmare's upgraded plant at Moma demonstrates how strategic infrastructure investment can unlock decades of operational value from challenging ore bodies. This approach reflects broader trends within the mining industry towards maximising value from existing resources rather than pursuing new greenfield developments.

Furthermore, the project's emphasis on processing innovation addresses fundamental challenges facing mature mining operations globally. The technological solutions developed for Nataka's high-slimes ore could influence similar operations worldwide, contributing to improved resource utilisation across the heavy minerals sector.

Additionally, Kenmare's official Moma mine overview provides comprehensive details about the operation's strategic significance and long-term development plans, highlighting the broader context of this major upgrade project.

Please note that mineral investments involve significant risks including commodity price volatility, operational challenges, and regulatory changes. While this project involves proven reserves and established operations, all mining investments should be evaluated carefully with consideration of inherent industry risks and individual financial circumstances.

The Moma titanium mine upgrade project stands as a testament to strategic planning in the mining sector, demonstrating how targeted technological investment can unlock decades of operational value from proven resources. The successful commissioning marks the beginning of a new chapter that positions this Mozambican operation as a cornerstone of global titanium supply for generations to come.

Ready to Capitalise on Major Mining Developments?

Discovery Alert instantly notifies investors of significant ASX mineral discoveries using its proprietary Discovery IQ model, helping subscribers identify transformative opportunities like major mine upgrades and strategic transitions before the broader market responds. Explore Discovery Alert's dedicated discoveries page to understand how historic mineral breakthroughs have generated exceptional returns, then begin your 30-day free trial to position yourself ahead of the next major development.

Share This Article

Latest News

Share This Article

Latest Articles

About the Publisher

Disclosure

Discovery Alert does not guarantee the accuracy or completeness of the information provided in its articles. The information does not constitute financial or investment advice. Readers are encouraged to conduct their own due diligence or speak to a licensed financial advisor before making any investment decisions.

Please Fill Out The Form Below

Please Fill Out The Form Below

Please Fill Out The Form Below